2023 ADA Remediation Project

Summary
The City of Sammamish 2023 ADA Remediation Project consists of upgrading non-ADA compliant facilities within the City’s following right-of-way locations:
- Sidewalk Repairs Between Wolverine Way (Pine Lake Middle School Entrance) & 228th Avenue SE
- ADA Retrofits at Intersection Corners of Wolverine Way & Issaquah Pine Lake Rd
- ADA Retrofits at Crosswalk on 228th Ave SE, Near SE 32nd Street
The retrofits and repairs will include removing and replacing existing concrete curb, concrete sidewalk, curb ramps, asphalt pavement, and traffic control devices. Additional work includes modifying pedestrian push buttons, roadway striping and adjusting utilities in the curb and sidewalk.
This project is part of the City of Sammamish ADA Transition Plan. The purpose of the plan is to identify and remove barriers which impede access to City buildings, parks, and pedestrian facilities in the public right-of-way. For more information on the ADA Transition Plan, visit the link below.
https://www.sammamish.us/projects/ada-transition-plan/
Construction Information
(Updated September 13th, 2023)
The sidewalk repairs on the south side of Issaquah-Pine Lake Road between 228th Avenue SE and Wolverine Way have been poured. The sidewalks will remain closed overnight to allow for the concrete to cure. Sidewalk access will be restored in the morning, on September 14th. Electrical work for this project has also been completed.